Figure 6-2: Installation Procedure For Slave Ups (4) - Toshiba G9000 Series Installation Manual

Sync kit
Hide thumbs Also See for G9000 Series:
Table of Contents

Advertisement

IO1 PCB
(IOAU-09*)
Part No. 17
Wire (Jumper)
12
UP1 PCB
(UPGR-M*) CN50
Field-installed wirings
From MASTER UPS
Figure 5-c. Installation procedure for SLAVE UPS (3)
TN1
13
14

Figure 6-2: Installation procedure for SLAVE UPS (4)

G9000 80-225kVA TOSHIBA SYNC KIT Installation Manual – 94469-001
Part No. 6
Flat cable
VS1 PCB
(VSAU-16*) CN1
* Use part no.13
Four (4) screws (M5) with
spring washer and flat washer for
the assembly
The terminal of TN1
on IO1 PCB (IOAU-09*)

Advertisement

Table of Contents
loading

Table of Contents