System Operation - Intec FORCE/3 HP2 Instruction Manual

Insulation blowing machine
Table of Contents

Advertisement

c. WIRELESS REMOTE if desire to control the system with the GOWIRELESS
controls.
Note: Place transmitter in jacket and mount on hose, wrist, or use
lanyard to place around neck, or remove from jacket and use belt clip to
fasten on belt, or carry in pocket.
6. Ensure your system is located on a stable flat surface to maintain even loading
and blowing.
NOTE: Prior to turning the system 'on', make sure the hopper is empty.
Sometimes reducers, power cords, wired and/or wireless remotes, hose,
and various other tools are left in the hopper. Starting the system with
these items in the hopper can cause damage to the agitator, the airlock,
and to the items left in the hopper.

System Operation:

Load Insulation -- Remove packaging and
load insulation.
Video of interest:
https://www.youtube.com/watch?v=KeV6ZkIU87Y&feature=youtu.be
* video and below photographs of loading procedures are of older FORCE 3 systems
T: 303-833-6644
Original Language - English
800-666-1611
or
Instruction Manual
www.inteccorp.com
|
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents