Installation Safety Recommendations; General Operating Safety; Electrical Safety; Rack Mounting Recommendations - H3C UniServer R4900 G3 User Manual

Hide thumbs Also See for UniServer R4900 G3:
Table of Contents

Advertisement

Installation safety recommendations

To avoid bodily injury or damage to the server, read the following information carefully before you
operate the server.

General operating safety

To avoid bodily injury or damage to the server, follow these guidelines when you operate the server:
Only H3C authorized or professional server engineers are allowed to install, service, repair,
operate, or upgrade the server.
Make sure all cables are correctly connected before you power on the server.
Place the server on a clean, stable table or floor for servicing.
To avoid being burnt, allow the server and its internal modules to cool before touching them.

Electrical safety

WARNING!
If you put the server in standby mode (system power LED in amber) with the power on/standby
button on the front panel, the power supplies continue to supply power to some circuits in the server.
To remove all power for servicing safety, you must first press the button, wait for the system to enter
standby mode, and then remove all power cords from the server.
To avoid bodily injury or damage to the server, follow these guidelines:
Always use the power cords that came with the server.
Do not use the power cords that came with the server for any other devices.
Power off the server when installing or removing any components that are not hot swappable.

Rack mounting recommendations

To avoid bodily injury or damage to the equipment, follow these guidelines when you rack mount a
server:
Mount the server in a standard 19-inch rack.
Make sure the leveling jacks are extended to the floor and the full weight of the rack rests on the
leveling jacks.
Couple the racks together in multi-rack installations.
Load the rack from the bottom to the top, with the heaviest hardware unit at the bottom of the
rack.
Get help to lift and stabilize the server during installation or removal, especially when the server
is not fastened to the rails. As a best practice, a minimum of two people are required to safely
load or unload a rack. A third person might be required to help align the server if the server is
installed higher than check level.
For rack stability, make sure only one unit is extended at a time. A rack might get unstable if
more than one server unit is extended.
Make sure the rack is stable when you operate a server in the rack.
To maintain correct airflow and avoid thermal damage to the server, use blanks to fill empty rack
units.
2

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UniServer R4900 G3 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents