Hydraulic Connections; Electric Connections - AERMEC VED Series Technical Manual

Inverter fan coils for horizontal and vertical ducted installation
Hide thumbs Also See for VED Series:
Table of Contents

Advertisement

HYDRAULIC CONNECTIONS

B
A

ELECTRIC CONNECTIONS

The unit must be connected directly to an
electrical outlet or to a separate circuit.
Operations performed by persons without the
required technical skills can lead to personal
injury to the operator or damage to the unit
and surrounding environment.
Supply the fan coil only with voltage 230V ~
50Hz.
The fan coil may be permanently damaged if a
different electric power supply is used.
ATTENTION: it is mandatory to connect the
Phase (L) and the Neutral (N) power supply
cables to the relative clamps. Do not reverse
the connections. Follow the wiring diagram.
Install a device, master switch or electric plug
that allows the unit's power supply to be
completely disconnected.
To protect the unit against short circuits, fit an
omnipolar magnet circuit breaker switch (4Ac,
C-type intervention features) to the power
supply line with a minimum contact opening
distance of 3 mm.
We recommend using differential devices
suitable for intervening for currents of different
type:
sinusoidal AC and pulsating DC
currents suddenly applied or slowly rising.
sinusoidal AC with frequency up to
1000 hz
The following measures must be considered for
installations with three-phase power supply:
1. In the presence of 3P + N isolators or magnet
circuit breakers, the release current must be at
least 170% of the value absorbed by the overall
IVEDITI 1707 - 4880981_01
40
Air vent valves
and water drain from coil
load of the fan coils for each phase.
2. The neutral wire section must be sized
considering a working current equal to 170% of
the value absorbed by the overall load of the fan
coils for each phase.
SPECIFICATIONS OF THE CONNECTION CABLES
Use H05V-K or N07V-K power cables with
300/500 V insulation enclosed inside a pipe or
trough.
Use a cable with a minimum cross-section of 1
mm2.
All the cables must be enclosed inside a pipe or
trough until they are inside the fan coil.
The cables at the outlet of the pipe or cable
trough must be positioned in a way not to
undergo traction or twisting stress and be
however, protected from external agents.
Cables with strand can only be used with
crimped connectors. Make sure that the
strands are well inserted.
The wiring diagrams are subject to constant
updating and it is therefore mandatory to refer
to those on the unit.
The unit must be combined with a control
device to be purchased separately.
Refer to the wiring diagram and instructions in
this manual before making the connections.
The control panel can be fitted on a metal wall,
unless it is permanently connected to the earth
plug.
Carefully read the instructions and, if necessary,
carry out the configuration as indicated, before
installing the control device. Some control
devices must be combined with components
supplied as accessories, verify their availability.
- Make the hydraulic connections.
ATTENTION: Always use a wrench and
counter-wrench to fix the pipes.
The position, type and diameter of the
hydraulic connections are specified in the
dimensional data.
It is recommended to insulate water
pipelines and/or to install the suitable
auxiliary condensate collection tray, available
as an accessory, in order to avoid dripping
during cooling operation.
During installation check the seal of the
connections.
Attention: Discharge the hydraulic system
The vent valves are positioned on the top of
the coil close to the hydraulic fittings.
Attention: to drain the unit, use the
discharge valves placed at the bottom of the
coil close to the hydraulic fittings.
ATTENTION: Verify that the control device is
compatible with the electrical features of the
fan coil.
In combining the control devices, follow the
relative wiring diagram and the instructions in
this manual.
If present, connect the valve and the probe
to the terminal board according to the
positions specified in the wiring diagram. In
installations with three-way valve, the minimum
temperature probe of the water must be
moved from its seat in the coil, to the flow pipe
upstream of the valve.
Follow the wiring diagram.
ATTENTION: verify whether the installation
has been carried out correctly. Follow the
verification procedures indicated in the manuals
of the control devices.
ATTENTION: Then run an operating test.
ATTENTION: In case of malfunction, refer to the
Alarm Code Table to interpret the signals of the
2 LED (Alarm/Power) indicating the functioning
status of the unit. The Inverter board is found
inside the unit.
DANGER! Only qualified maintenance
personnel can access it.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents