Lewmar V8 Owners Installation, Operation & Servicing Manual page 12

Windlass
Table of Contents

Advertisement

GB
3.8 Model V8 remote brake cable installation (optional)
Illustrations based on 68000876
3.8-1
1. Insert one end of the brake cable into band brake
pins on deck unit ensuring that both parts are fully
located into recesses of pins as shown.
2. Rotate hand wheel anti-clockwise until the slide
has fully wound back as shown.
Insert other end of cable.
3. Rotate handwheel clockwise to move slide up into
the housing body ensuring that cable end is fully
located in slide recess.
• Keep rotating handwheel until the outer sheath of
cable is fully located into end of housing body and
slack cable is taken up.
• Firmly secure to deck with M10 / 3/8" CSK Head
bolts.
3.9 Model V9/10/12 remote brake installation (optional)
1. Select suitable position of band brake ring for brake
wheel position.
• Insert brake wheel UJ connecter shaft in handle
socket of deck unit ensuring that both parts are
fully located.
• Hand tighten shaft until brake is applied, then back
off 3 full turns.
• Once position of band brake and operating handle is
established drill deck and secure using (20mm V9 /
24mm V10-12) stud through deck.
12
3.8-2
3.8-3
3.9-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V9V10V12

Table of Contents