Basic Program Operation - Pepperl+Fuchs OIT F113-B12-CB Series Manual

Identification system for high temperatures up to 500c
Table of Contents

Advertisement

OIT***-F113-B12-CB*
OITControl
8.4

Basic program operation

Establish connection to OIT systems
In order to establish a connection to an OIT system, proceed as follows:
1. Click
Figure 8.4
2. Select the desired OIT system from the drop-down list or maually enter the IP
address of the OIT system. More OIT systems may be added to the drop-
down list (by changing the file OITCamera.XML see chapter 11.1). If a new
connection to an OIT system is established, at the next program start, the
most recently used connection will be offered by default in the drop-down list
(last used/last used).
3. Click OK.
establishes the connection, and waits for confirmation from the OIT system.
Each successful step in the connection is confirmed with a green checkmark
in the dialog window. If an error occurs, a red cross will appear in the dialog
window. After the connection has been established, the button Disconnect is
activated.
40
or select Connect > file to OIT.
The dialog window Choose OIT system... will open:
Select OIT system... dialog box.
OITControl checks whether the desired OIT system is available,

Advertisement

Table of Contents
loading

Table of Contents