Installing; Snapping The Control Unit Onto The Power Module - Siemens SINAMICS G120 CU250S-2 Series Compact Operating Instructions

Hide thumbs Also See for SINAMICS G120 CU250S-2 Series:
Table of Contents

Advertisement

Installing

3.1

Snapping the Control Unit onto the Power Module

Installing the Control Unit on an IP20 Power Module
Procedure
Proceed as follows to connect Power
Modules and Control Units:
1. Locate the lugs at the rear of the Control
2. Mount the Control Unit onto the Power
The Power Module and the Control Unit are now connected with one another.
To remove the Control Unit, press on the release button on the Power Module and withdraw
the Control Unit.
Permissible Power Modules
You may operate the Control Unit with the following Power Modules:
● PM240
● PM240-2
● PM250
● PM260
● PM340 1AC
CU250S-2 Control Units
Compact Operating Instructions, 05/2014, A5E32899990B AB
Unit in the matching recesses of the
Power Module.
Module so that it audibly snaps into place.
3
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120 cu250s-2 dpSinamics g120 cu250s-2 pnSinamics g120 cu250s-2 can

Table of Contents