ABB SF6 LTB 245E1 BLG 1002A Product Manual page 166

Operatin mechanism 3-pole operation
Table of Contents

Advertisement

Dismantling the breaking unit for transport
34
11. Operate the circuit-breaker slowly towards the open position by cranking the
operating mechanism by hand and check that the alignment check hole,
D=6 mm, for the open position on the operating lever aligns with the hole in
the mechanism housing.
B10157
Figure 9-3. Mechanism housing's sign.
Adjustment of pull rod in OPEN POSITION
Correct contact position when holes A and B coincide
Check with pin diameter D=6
Inställning av manöverstång i FRÅN-LÄGE
Rätt kontaktläge när hål A och B sammanfaller
Kontrollera med en pinne diameter D=6
A
B
Overhaul Instructions
A+B
1HSB435409-201 enrev1