Assembly Instructions
4.5 Preparations for assembling the operating mechanism and
protective tube
1HSB435410-2 enrev1
Remove all the pole covers (1)
and the Close-Open signs (2), to
gain the best possible access to
the pole mechanisms.
Item
1
Cover
2
Sign
3
Coupling link
Figure 4-8. Dismantling the signs and cover.