ABB SF6 LTB 245E1 BLG 1002A Product Manual page 87

Operatin mechanism 3-pole operation
Table of Contents

Advertisement

Inspection intervals
To be inspected
8g.
Heaters
Operating mechanism
8h.
Central control cubicle
8i.
Thermostat
8j.
Terminal blocks
8k.
Direct on line motor
starter
16
Inspection interval
15 years or 5,000 mech. CLOSE/
OPEN operations.
15 years or 5,000 mech. CLOSE/
OPEN operations.
15 years or 5,000 mech. CLOSE/
OPEN operations.
15 years or 5,000 mech. CLOSE/
OPEN operations.
15 years or 5,000 mech. CLOSE/
OPEN operations.
Operating and Maintenance Instructions
Measures / Instructions /
Checking of resistance:
If applicable, check signal for loss of
power.
See Manual 1HSB515409-100 for BLG
1002A or 1HSB535409-100 for BLK
222.
Checking of resistance.
Small cubicle:
48 W, 110 V R = 330 Ohms +/- 10%
48 W, 220 V R = 1000 Ohms +/- 10%.
Middle or large cubicle:
140 W, 110 V R = 86 Ohm +/-10%
140 W, 220 V R = 346 Ohm +/- 10%.
If applicable, check that the thermostat
is adjusted to requested value.
See Manual 1HSB445410-100.
Tightening of screws or clamps.
See Manual 1HSB515409-100 for BLG
1002A or 1HSB535409-100 for BLK
222.
If applicable, check signal for loss of
power.
See Manual 1HSB515409-100 for BLG
1002A or 1HSB535409-100 for BLK
222.
1HSB435409-100 en1
Tools

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents