Step 4:
Step 5:
Step 6:
breaker.
Step 7:
More information can be found in MA1-BAT user manual.
___________________________________________________________________
Turn off the GRID switch incl. external AC circuit breaker.
If backup load is applied, turn off the Backup switch.
Turn off the PV switch on the cable box and the external DC
Close the inner cover and outer shell of Cable box.
United Renewable Energy Co., Ltd.
Page 33 of 45