URE MA1-INV Installation Manual page 25

Energy storage system
Table of Contents

Advertisement

Figure 26 Wiring the Power Cable of the Cable Box
Step 18: Connect the power cable from Step4 to the terminals of cable box.
Make sure that red connects to red and black connects to black.
Figure 27 PV Wiring
Step 19: Close the battery covers and connect the PV MC4 connectors as
shown in the diagram (both sides). At the same time connect all the AC, meter
___________________________________________________________________
United Renewable Energy Co., Ltd.
Page 24 of 45

Advertisement

Table of Contents
loading

Related Products for URE MA1-INV

Table of Contents