communication cable, ethernet communication cable and then close the cable
box cover. The installation is now complete.
Step 20: Open battery housing case and remove DIP baffle, set the DIP switch
2 to "on" mode at the bottom of the module. Then close the DIP baffle and
battery housing case.
NOTE: only the farthest battery from inverter need to set DIP.
If you want to add more batteries, please install the extra ones by the side as
shown below.
NOTE: when adding on battery modules, please install only by side.
You can add up to 6 extra batteries with each two in a string.
___________________________________________________________________
Figure 28 DIP Operation
Figure 29 Increase the Battery Modules
United Renewable Energy Co., Ltd.
Page 25 of 45