Debris Baffle, drill φ8, depth about 70 mm
Figure 13 Battery Installation - Drill Holes
Step 6: Keep the battery against the wall, drill holes on the wall with an impact
drill.
NOTE: please make sure a layer of protection must be placed over the
battery while drilling, it could be paper, wood board or packaging bubble,
as Figure 13 shows).
The ground upon which the battery will be placed on must be less than 3
degree to the horizontal level.