URE MA1-INV Installation Manual page 29

Energy storage system
Table of Contents

Advertisement

NOTE: Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the cable box/super
cable box.
ADL-3000 three-phase connect (without CT, with meter plug), if applicable:
Figure 35 ADL-3000 three-phase Connect (without CT, with Meter plug)
ADL-3000 three-phase connect (with CT, without meter plug), if applicable:
Figure 36 ADL-3000 three-phase Connect (with CT, without Meter plug)
NOTE: Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the cable box/super
cable box.
___________________________________________________________________
United Renewable Energy Co., Ltd.
Page 28 of 45

Advertisement

Table of Contents
loading

Related Products for URE MA1-INV

Table of Contents