Installation

This Manual introduces the basic steps how to install and set up URE MA1-INV.
NOTE: please pay attention for unpacking the battery, the worst case is that
some components could be damaged.
Observe the specified minimum distances to neighboring objects.
The minimum distances ensure that:
There is sufficient heat dissipation,
The storage system door can be opened easily,
There is sufficient space for carrying out maintenance work.

2.1 Installation Site and Environment

The following sites are not allowed for installation:
Sites where the freezing point is reached.
Sites with humidity and condensation over 85%.
Sites which are salty and where humid air can penetrate.
Flooded areas.
Earthquake areas –additional security measures are required here.
Sites that are higher than 2000 meters above the sea level.
Sites with explosive atmosphere.
Sites with direct sunlight.
Sites with extreme change of ambient temperature.
Wet rooms.
Sites with highly flammable materials or gases.
Sites with a potentially explosive atmosphere.
Installation wall load must be more than 180 kg
2.2 Installation
___________________________________________________________________
United Renewable Energy Co., Ltd.
Page 13 of 45