Figure 21 Inverter Wiring Completion Diagram
The single line diagram is as below:
NOTE: There must be a 32A AC circuit breaker (Grid switch) between
the inverter and the grid.
In Australia and New Zealand the neutral of backup and grid circuit
should be externally connected on the neutral bar.
Step 14: Lock the cable box back cover, leave the power line and communica-
tion line hang on the outside. Follow the diagram, pass the BAT-communica-
tion cable through the battery communication baffle in Step 2 and connect an
RJ45 connector, see Figure 21.