Figure 18 Cable Box Wiring Diagram
Step 11: Remove the cable box front cover, it can be removed by hand without
tools. Remove the screw to take off the back cover. Set the front and back covers
of cable box aside.
Power Cable
Network Cable Access
Figure 19 Communication and Power Cable Access
Step 12: Screw off the big and small waterproof terminals and pass the network
cable through the terminals, into the switch box. At the same time connect the
power cable of output side through waterproof terminal following the diagram.
(Here the network cable is not equipped with RJ45 plug).
Figure 20 Network Cable Connection Diagram