Power Meter; Meter Adl-3000 (If Applicable) - URE MA1-INV Installation Manual

Energy storage system
Table of Contents

Advertisement

2.3 Power Meter

The power meter should be installed and connected in the distribution box. There are
three kinds of power meters, ADL-3000, SM 60A or backup box can be chosen.
ADL-3000: three-/ single-phase meter (with or without CT)
SM60A: single-phase meter
Backup Box: three-/ single-phase meter (Contain off-grid switching and load
management)
2.3.1

Meter ADL-3000 (If Applicable)

ADL-3000 single-phase connect (without CT, without meter plug), if applicable:
Figure 30 ADL-3000 single-phase Connect (with CT, without Meter Plug)
NOTE: Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the cable box/super
cable box.
ADL-3000 single-phase connect (without CT, with meter plug), if applicable:
Figure 31 ADL-3000 single-phase Connect (without CT, with Meter plug)
___________________________________________________________________
LOAD
LOAD
United Renewable Energy Co., Ltd.
Page 26 of 45

Advertisement

Table of Contents
loading

Related Products for URE MA1-INV

Table of Contents