  • Page 1 Installation Manual Energy Storage System (ESS) V1.0 MA1-INV...
  • Page 2 IMPRINT United Renewable Energy Co., Ltd. 7, Li-Hsin 3rd Rd, Hsinchu Science Park, Hsinchu, Taiwan 300, R.O.C. Aug. 19 2019 ___________________________________________________________________ United Renewable Energy Co., Ltd. Page I of 45...
  • Page 3: Copyright Statement

    Copyright Statement This manual is under the copyright of United Renewable Energy Co., Ltd. with all rights reserved. Please keep the manual properly and operate in strict accordance with all safety and operating instructions in this manual. Please do not operate the system without reading through the manual.
  • Page 4: Table Of Contents

    4.2.3 History ......................36 4.2.4 Setting ......................38 Online Monitoring ..................42 5.1 Register ....................42 5.2 Registering License ................43 Annex ......................44 6.1 Datasheet – URE MA1-INV ..............44 ___________________________________________________________________ United Renewable Energy Co., Ltd. Page III of 45...
  • Page 5 ___________________________________________________________________ United Renewable Energy Co., Ltd. Page IV of 45...
  • Page 6: Introduction

    Figure 1 DC- and AC-/ Hybrid-coupled Storage System - Scheme CAUTION: For the AC-/ Hybrid-coupled system, unlike DC, two power meters are to be mounted. MA1-INV is only to be connected with MA1-BAT, a LFP battery. No other battery can be connected to MA1-INV. 1.2 General Precautions DANGER Danger to life due to high voltages of the PV array, battery and electric shock.
  • Page 7 ➢ Do not move the system when it is already connected with battery modules. ➢ Secure the system to prevent tipping with restraining straps in your vehicle. ➢ The transportation of URE MA1-INV must be made by the manufacturer or an instructed personal. These instructions shall be recorded and repeated.
  • Page 8: Parts List

    ➢ Lifting and transporting the inverter and battery must be carried out by more than 2 people. 1.3 Parts List Check the following parts list to ensure it is complete. URE delivers a total system separately on site to client, this consists of: MA1-INV 1x Mounting 10x M6...
  • Page 9 ___________________________________________________________________ United Renewable Energy Co., Ltd. Page 8 of 45...
  • Page 10: System Appearance

    1.4 System Appearance Figure 2 MA1 Delivery Scope Object Description Hybrid Inverter with Cable Box Display Screen Cable Box Part of Inverter MA1-BAT (Battery 1) MA1-BAT (Battery 2) ___________________________________________________________________ United Renewable Energy Co., Ltd. Page 9 of 45...
  • Page 11 Cable Box Part Figure 3 Inverter with Cable Box – Front View Figure 4 Inverter with Cable Box - Rear View Figure 5 Cable Box Part– Front View Item Name Description Switch for disconnecting the BAT(1) Battery Switch batteries from inverter GRID GRID Switch Switch between inverter and grid...
  • Page 12: Liability Limitation

    Terminal 1, 2 Battery Connect Terminal 1.5 Liability Limitation Any product damage or property loss caused by the following conditions URE does not assume any direct or indirect liability. • Product modified, design changed or parts replaced without URE authorization;...
  • Page 13 • Force majeure (violent or stormy weather, lightning, overvoltage, fire etc.); • Damages caused by any external factors. ___________________________________________________________________ United Renewable Energy Co., Ltd. Page 12 of 45...
  • Page 14: Installation

    Installation This Manual introduces the basic steps how to install and set up URE MA1-INV. NOTE: please pay attention for unpacking the battery, the worst case is that some components could be damaged. Observe the specified minimum distances to neighboring objects.
  • Page 15 Figure 7 Unpacking the inverter and battery Step 1: Remove the battery and inverter from the packaging box. Communication wiring baffle Figure 9 Battery with Lid off – Side View Figure 8 Battery with Lid off - Front View Step 2: Open battery housing case and remove communication wiring baffle at the left side.
  • Page 16 Figure 11 Battery power cable installation diagram Step 4: Close the battery front cover and connect the power cable at the top. NOTE: if there is an “indoor” sign on the top cover, the battery can only be installed indoor. M5*10 Screws Figure 12 Assemble Battery Mounting Panel Step 5: Assemble the battery mounting panel on the battery.
  • Page 17 Debris Baffle, drill φ8, depth about 70 mm Figure 13 Battery Installation - Drill Holes Step 6: Keep the battery against the wall, drill holes on the wall with an impact drill. NOTE: please make sure a layer of protection must be placed over the battery while drilling, it could be paper, wood board or packaging bubble, as Figure 13 shows).
  • Page 18 Figure 14 Battery Installation – Mounting on the Wall Step 7: Remove the debris baffle and secure the battery to the wall with screws. Figure 15 Battery Installation – Second Battery Installation Step 8: Follow Step6 and Step7 to install the second battery. Figure 16 Inverter Mounting Panel Installation Step 9: Install the inverter mounting panel and mounting bracket with M4 nuts as shown above.
  • Page 19 M6 Nuts Figure 17 Inverter Installation - Inverter Mounting Panel Step 10: Drill holes on the wall with impact drill first then install and position inverter mounting panel. Battery installation is now completed. ___________________________________________________________________ United Renewable Energy Co., Ltd. Page 18 of 45...
  • Page 20 Figure 18 Cable Box Wiring Diagram Step 11: Remove the cable box front cover, it can be removed by hand without tools. Remove the screw to take off the back cover. Set the front and back covers of cable box aside. Power Cable Network Cable Access Figure 19 Communication and Power Cable Access...
  • Page 21 Step 13: Lock waterproof connector, plug in the RJ45 plugs on LAN1 and Me- ter’s ends inside cable box, and then plug in RJ45 and cable on the other side of LAN1 and Meter’s ends outside of cable box (leave some length as the other side might need to be connect to router or meter).
  • Page 22 Figure 21 Inverter Wiring Completion Diagram The single line diagram is as below: NOTE: There must be a 32A AC circuit breaker (Grid switch) between the inverter and the grid. In Australia and New Zealand the neutral of backup and grid circuit should be externally connected on the neutral bar.
  • Page 23 Figure 22 Network Cable Type B NOTE: The communication cable is in type B, see Figure 22. Leave the power cables and communication cables hang on the outside. Leave the device aside. Figure 23 Inverter Installation on the Wall Step 15: Hang the inverter onto the mounting panels, adjust the entire system and ensure that the battery and the inverter have been securely hung onto the panels and brackets.
  • Page 24 Figure 24 Wiring the Communication Cable Step 16: Connect the communication cable from cable box from step14 to the battery. Use the communication cable from parts list to connect the two batteries at the side. After all above connections done then lock all communication baffles.
  • Page 25 Figure 26 Wiring the Power Cable of the Cable Box Step 18: Connect the power cable from Step4 to the terminals of cable box. Make sure that red connects to red and black connects to black. Figure 27 PV Wiring Step 19: Close the battery covers and connect the PV MC4 connectors as shown in the diagram (both sides).
  • Page 26 communication cable, ethernet communication cable and then close the cable box cover. The installation is now complete. Figure 28 DIP Operation Step 20: Open battery housing case and remove DIP baffle, set the DIP switch 2 to “on” mode at the bottom of the module. Then close the DIP baffle and battery housing case.
  • Page 27: Power Meter

    2.3 Power Meter The power meter should be installed and connected in the distribution box. There are three kinds of power meters, ADL-3000, SM 60A or backup box can be chosen. ➢ ADL-3000: three-/ single-phase meter (with or without CT) ➢...
  • Page 28 ADL-3000 single-phase connect (with CT, without meter plug), if applicable: LOAD Figure 32 ADL-3000 single-phase Connect (with CT, without Meter plug) NOTE: Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the cable box/super cable box. ADL-3000 single-phase connect (with CT, meter plug), if applicable: LOAD Figure 33 ADL-3000 single-phase Connect (with CT, with Meter plug) ADL-3000 three-phase connect (without CT, without meter plug), if applicable:...
  • Page 29 NOTE: Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the cable box/super cable box. ADL-3000 three-phase connect (without CT, with meter plug), if applicable: Figure 35 ADL-3000 three-phase Connect (without CT, with Meter plug) ADL-3000 three-phase connect (with CT, without meter plug), if applicable: Figure 36 ADL-3000 three-phase Connect (with CT, without Meter plug) NOTE: Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the cable box/super cable box.
  • Page 30: Meter Sm60A (If Applicable)

    ADL-3000 three-phase connect (with CT, with meter plug), if applicable: Figure 37 ADL-3000 three-phase Connect (with CT, with Meter plug) NOTE: CT connect, connect S1 to L1, S2 to L1’. For AC-/ Hybrid-system, there are two meter needed: Option 1: with Meter Plug Option 2: without Meter Plug Figure 38 Two Meter Connect, with Meter Figure 39 Two Meter Connect, without Meter...
  • Page 31: Backup Box (If Applicable)

    Option 2: without Meter Plug Figure 42 Two Meter Connect, with Meter Figure 43 Two Meter Connect, without Meter Plug Plug 2.3.3 Backup Box (If Applicable) Backup Box Connect to MA1-INV (single-phase grid in house): patch cable GRID_L1 LOAD_L1 PV-INV_L1 AC_L1 BAK_L1...
  • Page 32: System Operation

    System Operation 3.1 Switch on/Connecting System shall be turned on in the correct sequence to avoid any damage. Step 1: Open cable box outer shell. Step 2: Unlock then open Cable box inner cover. Cable box locker can be opened without tools. Step 3: Turn on the PV switch on the cable box.
  • Page 33: Switch Off

    Step 6: Turn on the Battery switch. Step 7: Press button 1 on all the batteries, and the indicator light 2 will be on. Step 8: Close the inner cover and outer shell of Cable box. 3.2 Switch off/Disconnecting Step 1: Open Cable box following the steps in 4.1 Step 1, 2.
  • Page 34 Step 4: Turn off the GRID switch incl. external AC circuit breaker. Step 5: If backup load is applied, turn off the Backup switch. Step 6: Turn off the PV switch on the cable box and the external DC breaker. Step 7: Close the inner cover and outer shell of Cable box.
  • Page 35: Ems Introduction And Set Up

    EMS Introduction and Set up 4.1 Function Description Figure 45 MA1 EMS Interface Object Name Description Green: The inverter is in normal state. Blue: The battery is in charging or discharging. Indicator LED Yellow: The inverter is in communication. Red: The inverter is in fault.
  • Page 36: Introduction

    4.2 Introduction This part is suitable for EMS firmware-version 1.01.67 and above. For firmware updating please contact with URE aftersales team. 4.2.1 Main Main displays the inverter working status and information, including: • Power: Total PV power • Total: Total power generation.
  • Page 37: History

    Solar interface displays the real-time information of PV side: voltage U1, current I1, power P1, voltage U2, current I2 and power P2. Figure 50 Solar Interface Battery interface displays the real-time information of battery side: voltage U, current I, power P, residual capacity of Battery (SOC), the internal environmental temperature Temp Figure 51 Battery Interface...
  • Page 38 Grid Consumption interface displays today’s or total load consumption from grid Figure 55 Grid Consumption Interface INV Gen. interface displays today’s or total electricity quantity generated from MA1- INV. Figure 56 INV Gen. Interface Bat Gen. interface displays today’s or total electricity quantity discharged from the battery.
  • Page 39: Setting

    PV Charge interface displays today’s or total electricity quantity battery charging from the PV-panels. Figure 60 PV Charge. Interface Error Logs interface displays 10 pieces of the latest fault records of device, including the name of the fault and time of error Figure 61 Error Logs Interface 4.2.4 Setting...
  • Page 40 Figure 65 Solar Setting Interface Figure 66 Battery Model Interface Step 4: Set on-grid capacity, storage Step 5: Click the Battery Function and capacity and number of PV strings check battery type MA1-BAT. (MPPT number). Figure 67 SOC Calibration Interface Figure 68 Battery Ready Interface Step 6: Check SOC Calibration function Step 7:...
  • Page 41 Figure 73 Force Charge Setting Interface Figure 74 Force Charge Time Setting Interface Step 12: If you want to use force charge, Step 13: Set the charge and discharge sett Enable here. time. Figure 75 UPS Reserve SOC Setting Interface Figure 76 Safety Setting Interface Step 14: Set the UPS Reserve SOC, it Step 15: Click Safety in the setting...
  • Page 42 Automatic display one parameter: MAC Address: display MAC Address. Figure 79 Date&Time Setting Interface Figure 80 Date&Time Setting Interface Step 18: Click Language to set language Step 19: Make sure all the following number is correct. ___________________________________________________________________ United Renewable Energy Co., Ltd. Page 41 of 45...
  • Page 43: Online Monitoring

    Online Monitoring 5.1 Register You have to create a new account on our webserver for the normal monitoring. In addition, a part of our warranty is based on this connection to our webserver. The data before the registration would not be retained on the webserver. So please use the following steps: Open the portal: www.alphaess.com.
  • Page 44: Registering License

    5.2 Registering License Click Install new system to register the license No. Figure 74 Menu for Installer Figure 74 System Registering Interface Input S/N, Check Code, License No., Date, Name, and Contact No. to complete the registering process. ___________________________________________________________________ United Renewable Energy Co., Ltd. Page 43 of 45...
  • Page 45: Annex

    Annex 6.1 Datasheet – URE MA1-INV System Model MA1-INV Battery MA1-BAT Installed Capacity 5.7/11.5/17.2/22.9/28.7/34.4 kWh Usable Capacity 5.2/10.3/15.5/20.6/25.8/30.9 kWh ≥6000 Cycle Life Product Warranty 5 Years Performance 10 Years Warranty Phase Single Phase Display Communication Ethernet Operating -10℃ To 50℃*...