Handling The Board; Board-Setup Revision Proto; Toggle-Switch S1 - Pcie; Toggle -Switch S5 - Sc Spi-Flash Enable - Arrow Everest-CortexM1-SFP+Loop-Demo User Manual

Table of Contents

Advertisement

Arrow Central Europe GmbH
User Guide
2.2

Handling the Board

Pay attention to the following points while handling or operating the board:
Handle the board with electrostatic discharge (ESD) precautions to avoid damage.
For information about ESD precautions see
https://www.microsemi.com/documentportal/doc_view/126483-esd-appnote.
2.3

Board-Setup Revision PROTO

Toggle-Switch S1 – PCIe
2.3.1
Warning: S1-1 and S1-2 must not be at position on at the same time!
SWITCH ON
S1-1
S1-2
Toggle -Switch S5 – SC SPI-Flash enable
2.3.2
Warning: S5-1 and S5-2 must not be at position on at the same time!
SWITCH ON
S5-1
S5-2
DIP-Switch S8 – FMC Voltage Selector
2.3.3
Warning: S8-1 to S8-4 must not be at position on at the same time!
SWITCH ON
S8-1
S8-2
S8-3
S8-4
Toggle -Switch S9 – VDDAUX2 & VDDAUX5 Voltage
2.3.4
Warning: S9-1 and S9-2 must not be at position on at the same time!
SWITCH ON
S9-1
S9-2
PCIe LANES
x1
x4
SC SPI-FLASH
ENABLE
DISABLE
FMC VOLTAGE
3.3 V
2.5 V
1.8 V
undefined (not connected)
VDDAUX2 & VDDAUX5
2.5 V
FMC voltage
page 7
Everest-CortexM1-Demo

Advertisement

Table of Contents
loading

Table of Contents