2. Check Point about the Radiant Heat– with Fan
Example of minimum spacing and placement during landfill installation
Min 60mm
Min 60mm
Recommended condition : Min 500mm (set ~ ceiling)
Min 100mm when maintaining the indoor temperature below 25 degrees due to
air conditioning operation
Min 100mm (set ~ floor)
※ Vent and interior finishing work will proceed after screen installation
Air vent area must use mesh with
an opening rate of 60% or more
left and right sealing
Air vent area
Must use mesh with an opening
rate of 60% or more
Min 60mm
Samsung Electronics
Excluding FAN
should be sealed
12