Hardware Installation

V
CAUTION!
Please note the safety instructions in chapter "Important Notes" on
page 11.
Do not expose the server to extreme environmental conditions (see
section "Technical Data" on page 5). Protect it from dust, moisture, and
heat.
The server must be acclimatized in its operating environment for an accli-
matization time.
Temperature difference (°C)
(operating environment/outside)
5
10
15
20
25
30
Table 2: Acclimatization time
4.1

Installation Steps

The following installation steps are described in detail in other sections of this
chapter:
Ê Unpacking the server (see next section "Unpacking the Server").
Ê Mounting the server into the rack (see the layout arrangement created with
System Architect on the order lists).
Ê Cabling the server. Please also refer to the section "Instructions on
Connecting and Disconnecting Cables" on page 40.
Ê Connect the server to the power supply (see section "Connecting the Server
to the Mains" on page 39).
A26361-K875-Z102-3-7619
Minimum acclimatization time
(hours)
3
5
7
8
9
10
21