Tools and Meters
Torque screwdriver
Phillips screwdriver
(M3/M4/M5/M6/M
8)
3.1.3 Preparing Power Cables
Table 3-2
listed are measured at a rated voltage of 380 V.
Table 3-2 Recommended cross-sectional areas for power cables
Item
Mains
Mains input current (A)
Issue 06 (2019-12-13)
Cable cutter
Insulated torque
wrench
(M6/M8/M12/M16)
Table 3-1
lists only the common tools for installation and cable connection. For more dedicated tools
required, see the corresponding component manuals. Prepare tools based on site requirements.
The UPS can generate large leakage currents. A circuit breaker that provides leakage
current protection is not recommended.
If multiple UPSs are to be connected in parallel, input and output power cables for each
UPS should have the same length and specifications.
lists the recommended cross-sectional areas for power cables. Note that the currents
Copyright © Huawei Technologies Co., Ltd.
Brush
Heat shrink tubing
UPS5000-E-125K-FM
25 kVA
50 kVA
47
94
Flat-head
screwdriver
(2–5 mm)
Insulated adjustable
wrench
75 kVA
100 kVA
141
188
3 Installation
125 kVA
235
45