Page 2
ShenZhen GETECH CO.,LTD GEEETECH Safety Instructions Building the printer will require a certain amount of physical dexterity, common sense and a thorough understanding of what you are doing. We have provided this detailed instruction to help you assemble it easily.
Page 3
ShenZhen GETECH CO.,LTD GEEETECH Preparation 1. Unpack the kit and check if all parts are in the box and check the condition of each part, there might be some damage during shipping. To help you with this, there is BOM in the box and each bag was labeled with part number.
Page 4
ShenZhen GETECH CO.,LTD GEEETECH Chapter1 Base Assembly 1.1 Motor end assembly Name Part NO. Stepper motor Pulley Motor holder Motor holder support Square nut M3 X 12 Screw M3 X 16 Screw M3 washer ...
Page 5
ShenZhen GETECH CO.,LTD GEEETECH Step1. Mount the pulley on the motor shaft, one of the screws should be screwed on the cross section of the shaft. Do not screw too tight to turn smoothly.
Page 7
ShenZhen GETECH CO.,LTD GEEETECH Repeat the steps for the other 2 motor ends 1.2 Connect motor ends to base plate Name Part NO. base plate Square nut M3 X 16 Screw ...
Page 8
ShenZhen GETECH CO.,LTD GEEETECH M3 washer Step1. Mount the 3 assembled motor ends on the base plate (A1); screw it up with M3x16 screws and M3 square nuts. Repeat the step for the other 2 motor ends ...
Page 9
ShenZhen GETECH CO.,LTD GEEETECH 1.3 Mount the LCD panel Name Part NO. LCD frame LCD support LCD2004 www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 10
ShenZhen GETECH CO.,LTD GEEETECH Square nut M3 X 16 Screw M3 X 12 Screw Spacer M3 washer Knob Step1. Assemble the LCD frame and support plate together, screw up with M3 X 16 Screws and M3 square nuts.
Page 11
ShenZhen GETECH CO.,LTD GEEETECH Step2. Plug the aircraft- type spacer into the 4 screw hole on the LCD2004. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 12
ShenZhen GETECH CO.,LTD GEEETECH Step3. Screw up the frame and LCD2004 with 4 M3 X 12 Screws. Step4. Cover the knob and screw it up on the cross section, the screw is in the hole.
Page 14
ShenZhen GETECH CO.,LTD GEEETECH Step5. Mount the assembled LCD kit onto the base plate. Screw it up with 2 M3 X 16 screws and M3 square nuts. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 15
ShenZhen GETECH CO.,LTD GEEETECH 1.4 Mount the fan Name Part NO. Fan(40x40x10) M3 X 16 Screw M3 x 25 screw M3 Square nut M3 nut M3 washer Step1. Mount the fan on the fan mount; screw it up with 2 M3 X 25 screw and M3 nut and washer.
Page 16
ShenZhen GETECH CO.,LTD GEEETECH Step2. Mount the assembled fan mount on A2 with a M3 X 16 screw and M3 nut and washer. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 17
ShenZhen GETECH CO.,LTD GEEETECH 1.5 Mount the control board. Name Part NO. Control board GT2560 Spacer M3 X 12 Screw M3 washer Step1. Plug the aircraft- type spacer into the 4 screw hole on the control board.
Page 18
ShenZhen GETECH CO.,LTD GEEETECH Step2. Screw the control board to the base plate (A2) with 4 M3 X 12 Screws and m3 washer. 1.6 Mount the print bed. Name Part NO.
Page 19
ShenZhen GETECH CO.,LTD GEEETECH M3 washer *for your convenience, the heatbed for you is pre-soldered, you can mount them directly. step1. Stack the heatbed and the building platform together. Step2. Thread the M3X30 screw through the two plates and add washers and spring at this end.
Page 20
ShenZhen GETECH CO.,LTD GEEETECH Step3. Lock the other end with a wing nut. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 21
ShenZhen GETECH CO.,LTD GEEETECH Here is the finished picture. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 22
ShenZhen GETECH CO.,LTD GEEETECH Chapter 2 Top Plate Assembly 2.1 endstop mount Name Part NO. Top plate Endstop mount Endstop Square nut M3 washer M3 X 16 Screw Step1. Mount the three end stops onto the Endstop mount (A6), screw with M3 X 16 screws.
Page 23
ShenZhen GETECH CO.,LTD GEEETECH Step2. Mount the assembled parts onto the top plate. Screw up with M3 x 16 screws and M3 square nuts. Note the directions of the endstop.
Page 25
ShenZhen GETECH CO.,LTD GEEETECH 2.2 Drive wheel mount Name Part NO. Drive wheel mount Driven wheel holder 624zz ball bearing M3 X16 Screw M3 X25 Screw M4 X 25 Screw...
Page 26
ShenZhen GETECH CO.,LTD GEEETECH Step1. Mount the Drive wheel mount on A1; screw them up with M3 X25 screws, M3 nut and washers. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 27
ShenZhen GETECH CO.,LTD GEEETECH Step2. Thread the M3 x 16 screw through the driven wheel holder. Step3. Put the M4 x25 screw through the holes with the two 624ZZ bearings in between.
Page 28
ShenZhen GETECH CO.,LTD GEEETECH Step4. Mount the assembled driven wheel holder onto the top plate. And screw it with a wing nut. Pay attention to the direction of the driven wheel.
Page 29
ShenZhen GETECH CO.,LTD GEEETECH M5 x 16 screw M5 washer Find out the locating holes on the top plate; screw up the extruder with 4 M5 x 16 screws and washers.
Page 30
ShenZhen GETECH CO.,LTD GEEETECH Spool holder Side panel Spool holder Side panel M3X16 screw Square nut Screw up the spool holder panel on the top plate separately with M3X16 screw and M3 nut and washer.
Page 31
ShenZhen GETECH CO.,LTD GEEETECH Chapter3 mount the smooth rods Name Part NO. Smooth Rod Linear Bearing M4 X12 Screw M8 Washers M4 washer Step1. Insert the smooth rods into the slot on the base plate; put a M8 washer on the end of the rod.
Page 32
ShenZhen GETECH CO.,LTD GEEETECH Step2. Screw up the rods with M4x 25 screws and M4 nuts. Repeat the above two steps for other rods. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 33
ShenZhen GETECH CO.,LTD GEEETECH Step3. Slide the 6 linear bearings into the 6 smooth rods separately. Step4. Put a M8 washer on each top end of the rods and cover the top plate on the rods, screw them up with M4x 25 screws and M4 nuts.
Page 35
ShenZhen GETECH CO.,LTD GEEETECH Chapter 4 Assemble the print platform Name Part NO. Diagonal Rod rod-end bearing holder (30x30x10) Hotend Endstop Spider Hotend bracket www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 36
ShenZhen GETECH CO.,LTD GEEETECH Hotend half bracket Fan mount Carriage Prob Zip tie Round head screw with pad M3 x 8 screw M3 x 12 screw M3 x 16 screw...
Page 37
ShenZhen GETECH CO.,LTD GEEETECH 3.5*30 spring M3 nut M4 nut M3 washer M4 washer M6 washer Printed lock ring 4.1 Assemble the spider Step1. Insert the hotend into the half bracket, stack the hotend bracket and half bracket together, screw up with 4 M3 x 16 screws and M3 nut.
Page 39
ShenZhen GETECH CO.,LTD GEEETECH If you are building G2s, the steps are the same. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 40
ShenZhen GETECH CO.,LTD GEEETECH Step2. Screw the fan onto the fan mount with 2 M3x 20 screws. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 41
ShenZhen GETECH CO.,LTD GEEETECH Step2. Mount the assembled fan and hotend onto the spider, using the following screws and nuts as shown in the picture. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 43
ShenZhen GETECH CO.,LTD GEEETECH 4.2 Assemble the auto-leveling probe Note please: as the auto-leveling probe was added to Rostock miniG2 after we finished the design, so this picture is taken after we finished the whole building, but we suggest you assemble the auto-leveling probe at this step.
Page 44
ShenZhen GETECH CO.,LTD GEEETECH Step2. Thread the probe into the hole. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 45
ShenZhen GETECH CO.,LTD GEEETECH Step3. Thread the spring and the lock ring around the prob and screw up the M3 screw in the ring. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 46
ShenZhen GETECH CO.,LTD GEEETECH 4.3 Assemble the diagonal rods. Step1. Mount the diagonal rod onto the carriage. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 47
ShenZhen GETECH CO.,LTD GEEETECH Step2. Repeat the above steps for the other diagonal rods. And mount another end of www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 48
ShenZhen GETECH CO.,LTD GEEETECH the diagonal rods to the spider. The directions should be as shown in the following picture. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 49
ShenZhen GETECH CO.,LTD GEEETECH Step3. Insert the M3 x 40 screw into the carriage, this screw is for the hitting of the endstop. As shown in the picture, there is a spring in between.
Page 50
ShenZhen GETECH CO.,LTD GEEETECH Step4. Connect the assembled print platform to the smooth rods. Mount the carriage onto the rods where the linear bearing is, insert the bearings into the slot.
Page 51
ShenZhen GETECH CO.,LTD GEEETECH Step5. Tie up the carriage and the bearings with two zip ties. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 52
ShenZhen GETECH CO.,LTD GEEETECH To help you see clearly, here is a detailed picture for the carriage. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 54
ShenZhen GETECH CO.,LTD GEEETECH Chapter5 Mount the Belt Name Part NO. Timing Belt Step1. Thread the belt through the drive wheel end. Pull it down to the pulley. Step2. Thread the belt around the pulley, and take both ends to the carriage.
Page 55
ShenZhen GETECH CO.,LTD GEEETECH Step3. Insert the belt into the slot. If the slot is too thin, you can use the grater to file it larger. Tie up the belt if needed.
Page 56
ShenZhen GETECH CO.,LTD GEEETECH To help you better understand this step, here is a short video for you to refer. https://www.youtube.com/watch?v=RP-J7jWmabg Repeat the above steps for the other 2 belts.
Page 57
ShenZhen GETECH CO.,LTD GEEETECH Chapter6 Connect the PTFE tube Name Part NO. Feeding pipe Step1. Plug one end of the tube into the push-fitting on the hotend and the other end into that of the extruder.
Page 58
ShenZhen GETECH CO.,LTD GEEETECH Chapter7 Wiring Before you start wiring, please take a look at the wiring schematics. You can see original picture here. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 61
ShenZhen GETECH CO.,LTD GEEETECH 4) Connect extruder Step4. Connect heating wires. Loosed the screws in the green terminal and put the red wires into the slot and screw it up.
Page 65
ShenZhen GETECH CO.,LTD GEEETECH 3) Connect heating wires for extruder 1. (needed if you are building G2s) www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 66
ShenZhen GETECH CO.,LTD GEEETECH Step4. Connect wires for thermistor. 1) Connect wires for thermistor of heatbed. 2) Connect wires for thermistor of extruder 0. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 67
ShenZhen GETECH CO.,LTD GEEETECH 3) Connect wires for thermistor of extruder 1. (needed if you are building G2s) www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 68
ShenZhen GETECH CO.,LTD GEEETECH Step5. Connect wires for endstop. 1) Connect wires for endstop of X-axis at X-max. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 69
ShenZhen GETECH CO.,LTD GEEETECH 2) Connect wires for endstop of Y-axis at Y-max. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 70
ShenZhen GETECH CO.,LTD GEEETECH 3) Connect wires for endstop of Z-axis at Z-max. 3) Connect wires for endstop of auto-leveling probe at Z-min. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 71
ShenZhen GETECH CO.,LTD GEEETECH Step6. Connect wires for Fan. 1) Connect fan for control board at FAN1. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 72
ShenZhen GETECH CO.,LTD GEEETECH 2) Connect fan for extruder at FAN3. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 73
ShenZhen GETECH CO.,LTD GEEETECH 2) Connect fan for hotend at FAN-PWM. Step7. Connect wires for LCD panel. There are two cables, one is for LCD encoder, the other is for SD card, do not connect them reversed.
Page 74
ShenZhen GETECH CO.,LTD GEEETECH Step8. Connect wires for power input. Name Part NO. Power cable www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 75
ShenZhen GETECH CO.,LTD GEEETECH Plug the other end into the PSU. Do not forget to cover it. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 76
ShenZhen GETECH CO.,LTD GEEETECH Step9.Connect the power cable to the input connector of PSU Name Part NO. 3D Power cable As shown in the red box. That is all for the wiring of GT2560.
Page 77
ShenZhen GETECH CO.,LTD GEEETECH Chapter8 Tidy out the wires Use the spiral coil to tie put those wires together. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Page 78
ShenZhen GETECH CO.,LTD GEEETECH So far, the Rostock mini G2 has been fully assembled. For detailed instruction of setting up, please refer to wiki. www.geeetech.com Tel: +86 755 2658 4110 Fax: +86 755 2658 4074 ‐ 858 ...
Need help?
Do you have a question about the Delta Rostock mini G2 and is the answer not in the manual?
Questions and answers