Inspecting The System - TA Instruments TMA 2940 CE Operator's Manual

Thermomechanical analyzer
Table of Contents

Advertisement

Installation
Inspecting
the System
NOTE:
2–10
Drying out the instrument may be needed, if it
has been exposed to humid conditions. Certain
ceramic materials used in this equipment may
absorb moisure, causing leakage currents to
exceed those specified in the applicable stan-
dards (see page xi) until the moisture is elimi-
nated. It is important to be certain that the
instrument ground is adequately connected to
the facilities ground for safe operation.
Run the following method to dry out the instru-
ment (refer to "Running Experiments" for
further information).
1
Ramp at 10°C/min to 400°C
2
Isothermal for 30 min.
TA I
NSTRUMENTS
TMA 2940 CE

Advertisement

Table of Contents
loading

Table of Contents