Connecting The Grounding Cable To The Chassis - H3C S6890 Series Installation Manual

Hide thumbs Also See for S6890 Series:
Table of Contents

Advertisement

Figure 8 Attaching the mounting brackets and chassis rails to the switch (power
module-side mounting position for the mounting brackets) (S6890-54HF)
Figure 9 Attaching the mounting brackets and chassis rails to the switch (network port-side
mounting position for the mounting brackets) (S6890-54HF)

Connecting the grounding cable to the chassis

CAUTION:
The primary grounding point and auxiliary grounding point 1 are located on the left panel of the
chassis. If you use one of these grounding points, you must connect the grounding cable to the
grounding point before you mount the switch in the rack.
The grounding cable and grounding screw that come with the switch are applicable to both the
primary and auxiliary grounding points.
To connect the grounding cable:
Choose a grounding point as required.
1.
This example uses the primary grounding point.
Unpack the grounding cable and grounding screws.
2.
Use two grounding screws to attach the two-hole grounding lug of the grounding cable to the
3.
grounding holes at the grounding point. Use a screwdriver to tighten the screws. See
8
Figure
10.

Advertisement

Table of Contents
loading

This manual is also suitable for:

S6890-54hfS6890-30hf

Table of Contents