Attaching The Slide Rails To The Rack - H3C S6890 Series Installation Manual

Hide thumbs Also See for S6890 Series:
Table of Contents

Advertisement

Figure 10 Attaching the grounding cable to the primary grounding point on the switch
(S6890-54HF)

Attaching the slide rails to the rack

The installation procedure is similar for short and long slide rails. The following procedure uses long
slide rails as an example.
To attach the slide rails to the rack:
Identify the slide rail installation position in the rack.
1.
Install cage nuts (user-supplied) in the mounting holes in the rack posts.
2.
Align the screw holes in a slide rail with the cage nuts in a rear rack post, and use screws
3.
(user-supplied) to attach the slide rail to the post, as shown in
Repeat the preceding steps to attach the other slide rail to the other rear rack post.
4.
Keep the two slide rails at the same height so that the slide rails can slide into the chassis rails.
Figure 11 Installing the slide rails
9
Figure
11.

Advertisement

Table of Contents
loading

This manual is also suitable for:

S6890-54hfS6890-30hf

Table of Contents