Cabling a dual-interconnect configuration
Procedures for cabling theThinkAgile CP dual-interconnect switch configuration.
Hardware management network connections (dual-interconnect configuration)
Connect the following ports to the management switch:
• Primary interconnect port 47 using a SFP+ Direct Attach Cable (DAC)
• Compute block port (C.M.) using a RJ45 patch cable
• Upper storage block port (S.U.M.) using a RJ45 patch cable
• Lower storage block port (S.L.M.) using a RJ45 patch cable
Figure 37. Hardware management network connectivity in a dual—interconnect configuration
Note: If not using the Lenovo ThinkSystem NE0152T RackSwitch as the management switch, you may
require different cables for the management network connections.
56
Lenovo ThinkAgile CP Hardware Installation Guide