Step 3.
Attach cable management devices (as shown).
Step 4.
Place the bezel on the front of the system.
Cabling a two-controller switchless cluster, unified network
configuration
Management network, UTA2 data network, and management ports on the controllers are connected to
switches. The cluster interconnect ports are cabled on both controllers.
Before you begin
See your network administrator for help connecting to the switches.
Step 1.
Cable your system using the following steps:
Note: As you insert the connector, you should feel it click into place; if you do not feel it click,
remove it, turn it around and try again.
1
AC
2
To data network
switch
Step
Perform on each controller
Cable the cluster interconnect ports.
Cable the UTA2 data ports to the data network switches.
Cable the management ports to the management network
switches.
DO NOT the plug power cords in at this point.
AC
3
To management
network switch
Ports used
• e0a to e0a
• e0b to e0b
• e0c and e0d
• or e0e and e0f
• e0M
Not applicable.
.
Chapter 4
System installation and setup
19