Step 5.
Connect all external cables.
Step 6.
If not using the 1U air‐duct option, install the power cord retention clip.
Note: The power cord retention clip is not used when the 1U air‐duct option is installed.
Figure 27. Installing power cord retention clip
The installation of the management switch is now complete.
.
Chapter 3
ThinkAgile CP Setup
45