Install The Thinkagile Cp Interconnect Switch - Lenovo ThinkAgile CP Series Hardware Installation Manual

Hide thumbs Also See for ThinkAgile CP Series:
Table of Contents

Advertisement

Install the ThinkAgile CP interconnect switch

Procedures for installing ThinkAgile CP interconnect switch in a rack.
Attention:
• The switch drawings in this topic are for illustration only and may not match your specific switch model.
• If you are using a non-Lenovo switch as the management switch, keep 1U of empty space between the
interconnect switches and the management switch so that power or network cables can use this space.
To install the ThinkAgile CP interconnect, do the following:
Note: When installing two interconnects, make sure that you install the secondary interconnect lower in the
rack than the primary interconnect. The secondary interconnect is labeled with a rack location label that is
lower than the rack location label of the primary interconnect.
Step 1.
Unpack the switch and check the contents.
Component
CAUTION:
The switch includes plug-in power supply (PSU) and fan tray modules that are installed into
its chassis. All installed modules must have a matching airflow direction. That is, if the
installed power modules have a front-to-back (F2B) airflow direction, all the installed fan tray
modules must also have an F2B airflow direction.
38
Lenovo ThinkAgile CP Hardware Installation Guide
Description
7Y67 switch
Rack mounting kit
• 2 front-post brackets
• 2 rear-post brackets
• 20 screws
• 2 ear-locking screws
Console cable, RJ-45 to DB-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinkagile cp6000Thinkagile cp4000

Table of Contents