15. Installing Field Wiring

(Figure 5a)
a) It is recommended that an independent power supply line be provided for the boiler.
Connect one 120 volt (60Hz) fused power line to terminal block to hot. Connect
applicable wires to neutral and ground. Connect a ground wire to green colored ground
lug in electrical control box.
Note
The boiler shall be installed such that the gas ignition system components are
protected from water (dripping, spraying, rain, etc.) during boiler operation and
service.
Warning
Do not attempt to start boiler to test wiring before filling and purging the boiler. A
dry fire will seriously damage the boiler and may result in property damage or
personnel injury and is not covered by warranty.
Caution
Label all wires prior to disconnection when servicing controls. Wiring errors can
cause improper and dangerous operation. Verify proper operation after servicing.
Figure 5a
Fulton Heating Solutions, Inc. -- PHW Manual -- 2010-0713
Page 31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Phw300Phw500Phw1400Phw2000Phw750Phw1000

Table of Contents