Maintenance; Preparation; Work To Be Carried Out; Spare Parts Recommendation - GEA F Series Assembly Instructions Manual

Bock compressors
Table of Contents

Advertisement

7| Maintenance

7.1 Preparation

WARNING! Before starting any work on the compressor:

7.2 Work to be carried out

To guarantee optimum operating safety and service life of the compressor, we recommend perfor-
ming service and checking work at regular intervals of time:
Oil change:
-
In series plants produced in the factory not mandatory.
-
In field installations or operating in the application limit range, first oil change after approx.
100 - 200 operating hours, then approx. every 3 years or 10,000 - 12,000 operating hours.
-
for NH
plants: oil change every year or every 5.000 operating hours.
3
Dispose of old oil according to the regulations, observe national regulations.
Annual checks: Oil level, tightness, running noise, pressures, temperatures, function of auxiliary
devices such as a oil sump heater, pressure switch. Comply with the national regulations!

7.3 Spare parts recommendation

Type
Designation
Set gaskets
Shaft seal
Valve plate set
Oil pump
Oil sump heater
Only use original Bock spare parts!
Switch off the compressor and secure it to prevent a restart.
Relieve compressor of system pressure.
Prevent air from infiltrating the system!
After maintenance has been performed:
Connect safety switch.
Evacuate compressor.
Release switch lock.
F2
F3
08069
08070
08001
08001
08314
08198
08043
08043
08423
08424
F14/1166
F4
F5
F14/1366
Ref. No.
08071
08072
08008
08008
08198
08436
08044
08044
08425
08425
F16/1751
F16/2051
08492
08493
08444
08012
08498
08498
08795
08795
08426
08426
21
D
GB
F
E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents