Installing A 1203-Gd1 Or 1203-Gk1 Module - Allen-Bradley 1203 Series User Manual

Remote i/o communications module
Table of Contents

Advertisement

Installing a 1203-GD1 or
1203-GK1 Module
Artisan Scientific - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisan-scientific.com
Required Tools and Equipment
To install your module, you need the following tools and equipment:
Remote I/O communications module (1203-GD1 or 1203-GK1).
35 x 7.5 mm DIN rail.
Appropriate cables for SCANport and Remote I/O connections.
Refer to the "Selecting Cables" section in this chapter.
Termination resistor (if necessary). Refer to the "Selecting a
Termination Resistor" section in this chapter.
115 V/230 V AC or 24 V DC power supply.
Installing the 1203-GD1 or 1203-GK1 Module
1. Remove power from the Remote I/O link.
2. Hook the top lip of the module DIN rail mount onto the top of the
DIN rail and then rotate the module onto the DIN rail. It snaps
into a locked position.
Figure 3.1
Mounting a Module onto the DIN Rail
Installing the Module
3–3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1203-gd11203-gk11336-gm1

Table of Contents