Veeder-Root VaporTEK Installation, Setup And Troubleshooting Manual page 49

Controller board
Table of Contents

Advertisement

VaporTEK Calibration
2. Connect the FB1 Terminal to the RS422 to the service connector if available or connect it directly to X4
connector. Direct connection requires batteries on FB1- Service Terminal.
3. Connect the gas meter encoder cable to the FB1 Terminal.
4. Connect the hoses to the gas meter.
5. Remove the nozzle from the dispenser holder and secure the A/L nozzle adapter to the spout of either the
ARVN or Elaflex nozzle as appropriate. The A/L adapter o-rings prevent air leakage into the nozzle's vapor
collection holes (see nozzle close up detail in Figure 23. After ensuring the nozzle shutoff port is not covered
by the adapter body, tighten the two knurled end rings to secure the adapter to the nozzle.
6. See manufacturer's nozzle manual on method to open the nozzle vapor valve for dry calibration.
7. FB1 Terminal key description:.
Manual Calibration Using The Speed Setup If High Voltage Signals M1 And M2 Are Used
START
Power ON the FB1 Terminal
ENTER
Confirm selection
SHIFT
Cancel selection
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vtek-3

Table of Contents