Keysight N5245-60121 Installation Note page 38

Add 4-port capability upgrade kit

Advertisement

Installation Procedure for the Upgrade
Step 36. Prepare the PNA for the User
1. If necessary, reinstall front jumper cables.
2. Install the cable guards, pushing them over the front jumper cables until
the cushioning material touches the front panel of the PNA.
3. Install the dust caps on the test ports.
4. Clean the analyzer, as needed, using a damp cloth.
38
Installation Note N5245-90121