Download Print this page

Keysight N5245-60121 Installation Note page 26

Add 4-port capability upgrade kit

Advertisement

Installation Procedure for the Upgrade
— W112 (N5245-20059) A51 port 3 mechanical switch to A30 port 3 reference
— W25 (N5245-20116) A30 port 3 ref coupler to front-panel REF 3 SOURCE
Figure 9
Location of Cable Clamp to Secure W25 (N5245-20116)
— W106 (reuse) N5245-20065 A50 port 1 mechanical switch to A29 port 1
— W89 (N5245-20026)A31 port 4 reference coupler to A40 port 4 source
— W85 (N5245-20026)A30 port 3 reference coupler to A39 port 3 source
— W93 (reuse) (N5245-20029) A32 port 2 reference coupler to A41 port 2
— W81 (reuse) (N5245-20029) A29 port 1 reference coupler to A38 port 1
— W103 (reuse) (N5245-20055) Port 2 RCVR B IN to A49 port 2 receiver
26
coupler
OUT
* As shown in
Figure
9, install clamp part number 1400-1334 to secure W25
reference coupler
attenuator
attenuator
source attenuator
source attenuator
attenuator
Installation Note N5245-90121

Advertisement