Download Print this page

Keysight N5245-60121 Installation Note page 34

Add 4-port capability upgrade kit

Advertisement

Installation Procedure for the Upgrade
3. Placing two fingers at the middle, press the overlay firmly onto the frame
Step 29. Install the Jumper Cables and Rear Panel Termination
— Install twelve W36 front panel jumper cables (N5245-20155) - use 6 old
— Install new W123 rear panel jumper cable (N5245-20155) from SW SRC
Step 30. Position the Cables and Wires to Prevent Pinching
On the top side of the PNA, carefully position the grey flex cables so they can't
be pinched between the covers and the rails.
On the bottom side of the PNA, carefully fold or push down the ribbon cables
and wires so they can't be pinched between the hardware and the outer cover.
Ribbon cables and wires must never be positioned on top of hardware.
Step 31. Reinstall the Inner Cover
For instructions, click the Chapter 7 bookmark "Removing the Covers" in the
PDF Service Guide
Step 32. Reinstall the Outer Cover
For instructions, click the Chapter 7 bookmark "Removing the Covers" in the
PDF Service Guide
Step 33.Remove Option 222 License
Procedure Requirements
— The analyzer must be powered up and operating to perform this procedure.
— The Network Analyzer program must be running.
— A keyboard and mouse must be connected to the network analyzer.
34
while sliding your fingers in opposite directions towards the ends of the
overlay. Repeat on all areas of the overlay.
jumpers and 6 new jumpers. To see an image of the front panel jumper
cables, click the Chapter 7 bookmark "Removing and Replacing the Front
Panel Assembly" in the PDF Service Guide
OUT (J4) to SW TSET IN (J3). To see an image showing the location of this
rear panel jumper, click on the Chapter 6 bookmark "Rear Panel Assembly,
All Options" in the PDF Service Guide
1
.
1
.
1. See
"Downloading the Online PNA Service Guide" on page
1
.
1
.
6.
Installation Note N5245-90121

Advertisement

loading