Download Print this page

Keysight N5245-60121 Installation Note page 14

Add 4-port capability upgrade kit

Advertisement

Installation Procedure for the Upgrade
"Step 28. Install the Overlay" on page 33
"Step 29. Install the Jumper Cables and Rear Panel Termination."
"Step 30. Position the Cables and Wires to Prevent Pinching."
"Step 31. Reinstall the Inner Cover."
"Step 32. Reinstall the Outer Cover."
"Step 33. Remove Option 222 License."
"Step 34. Enable Options 422."
"Step 35. Perform Post-Upgrade Adjustments and Calibration."
"Step 36. Prepare the PNA for the User."
Step 1. Obtain a Keyword and Verify the Information
Follow the instructions on the Software Entitlement Certificate supplied to
obtain a license key for installation of this upgrade. Refer to
Redemption" on page
Verify that the model number, serial number, and option number information
on the license key match those of the instrument on which this upgrade will be
installed.
If the model number, serial number, or option number do not match those on
your license key, you will not be able to install the option. If this is the case,
contact Keysight for assistance before beginning the installation of this
upgrade. Refer to
Once the license key file has been received and the information verified, you
can proceed with the installation at step 2.
If the model number, serial number, or option number do not match those
on your license key file, you will not be able to install the option. If this is
the case, contact Keysight for assistance before beginning the installation
of this upgrade. Refer to
Step 2. Remove the Outer Cover
For instructions, click the Chapter 7 bookmark "Removing the Covers" in the
PDF Service Guide
Step 3. Remove the Inner Cover
For instructions, click the Chapter 7 bookmark "Removing the Covers" in the
PDF Service Guide
14
5.
"Contacting Keysight" on page
1
.
1
.
1. See
"Downloading the Online PNA Service Guide" on page
"Contacting Keysight" on page
"License Key
4.
4.
6.
Installation Note N5245-90121

Advertisement

loading