Avaya S8800 Installing page 18

For avaya aura collaboration server
Hide thumbs Also See for S8800:
Table of Contents

Advertisement

Installing the Avaya S8800 Server
Important:
The slide rails that come with the server are compatible with standard 19-inch, 4-post racks
that have square holes. If you are installing the server in any other type of rack, Avaya
requires that the customer provide the appropriate rails or shelf for their rack. Rack Solutions
has numerous rail kits and shelf options. See
slide-rail-kit.shtml. This slide rail kit or a shelf would replace the Avaya-supplied slide rail kit
that ships with the server .
1. Select one of the slide rails and push up on the front moveable tab (1). See the
2. Pull out the front latch (2) to slide out the front side rail. See the preceding figure.
3. From the front of the rack, line up the three pins on the rear of the slide rail with the
4. Drop the slide rail down (4) until it latches into place. See the preceding figure.
5. Pull the slide rail forward, and insert the two pins (5) on the front of the rail into the
18
Installing the Avaya S8800 Server for Avaya Aura
following figure.
three holes in the selected U on the rear of the rack. Push the rails so that the pins go
into the holes (3). See the following figure.
two lower holes in the U on the front of the rack. See the following figure. Drop
the rail into place until it clicks.
http://rs.innovationfirst.com/ibm-x3x50-m2-
Collaboration Server
®
December 2010

Advertisement

Table of Contents
loading

Table of Contents