Installing The Avaya S8800 Server; Rack Installation Components - Avaya S8800 Installing

For avaya aura collaboration server
Hide thumbs Also See for S8800:
Table of Contents

Advertisement

Installing the Avaya S8800 Server

No.
instructions and in accordance
with all local codes and laws.
3
Verify that the rack is grounded in
accordance with local electrical
code.
4
Remove the cabinet doors, if
necessary.
7
Attaching the rails to the rack
page 17
8
Installing the server in the rack
page 19
Installing the cable management
arm
9
Replace the cabinet doors, if
necessary.
10
Turning on the server
page 24
11
Troubleshoot the installation.
Installing the Avaya S8800 Server

Rack installation components

The following figure shows the items that you need to install the server in the rack cabinet.
16
Installing the Avaya S8800 Server for Avaya Aura
Task
on page 21 (optional)
on
Notes
See Approved Grounds (555–245–772),
available at http://support.avaya.com.
See the cabinet manufacturer's
documentation.
on
on
See the cabinet manufacturer's
documentation.
Collaboration Server
®
December 2010