8 Commissioning
DANGER
Risk of electric shock when closing the fuses under load.
Death or serious injuries.
• Cover the PV modules with an opaque (dark) material.
• Follow all safety precautions of the module manufacturer.
The Sunny Central String-Monitor is only one part of the PV power system. The
commissioning of the Sunny Central String-Monitor may not be performed until all parts of
the PV power system are set up. A complete description of commissioning can be found in
the commissioning protocol of the Sunny Central.
Technical Description
Commissioning
SSMUS-TUS094511
53