Configuring Limitation Of Active Power Feed-In - SMA ennexOS SUNNY PORTAL Operating Manual

Table of Contents

Advertisement

SMA Solar Technology AG
Rights
Configuring user rights
Configuring notifications
Displaying notification configuration
Displaying CO² widget
Exporting data and parameters
Displaying energy balance
Displaying energy balance widget
Displaying energy and power
Displaying event monitor
Displaying yield widget
Entering device data manually (e.g.
gas meter)
Change device properties
Adding devices to systems
Displaying GMS widget
Importing parameters
Configuring parameter values
Displaying performance ratio widget
Activating service access
Configuring the SMA Smart Con-
nected
Displaying status widget
Creating and configuring system sec-
tions
Displaying weather widget
8.3

Configuring Limitation of Active Power Feed-In

With the Data Manager, you can implement grid operator specifications for the limitation of the
active power feed-in from 0% to 100% in your system. The setpoint for limitation of active power
feed-in is specified in percent. The total system power is taken as the reference value. If your grid
operator requires the system not to feed in any active power, you must limit the active power feed-in
to a fixed value of 0% and additionally adjust the preset value for the active power gradient. Thus,
it is possible to limit the active power feed-in to 0% within a few seconds. To compensate for load
Operating manual
Administrator
User group
Installer
EDMM-10-BE-en-20
8 Operation
User
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Data manager m

Table of Contents