Installation Instructions
IRST
ISION
The F
IRST
enclosure is factory
assembled and wired to
install/connect the LCD.
Enclosure's Control Board
LCD Power Cable
WARNING: Electrical Connections
!
If power is applied to F
F
V
IRST
ISION
F
V
IRST
ISION
follow standard Windows shut-down procedures.

2.3 LCD Installation

Step 1. Install the F
Step 2. Connect the LCD's power cable to the enclosure's control board as shown in Figure 2.2 on
Step 3. Connect the customer supplied LAN cable to the LAN port as shown in Figure 3.3 on
Step 4. Swing the LCD closed and fasten it closed by using the 2 factory supplied black pan head
Step 5. Close the LCD's glass paneled door.
Step 6. Use the factory supplied door key to lock the closed door.
Step 7. Verify the door locks and unlocks with each turn of the key.
Step 8. You are now ready to perform "Enabling F
14
V
ISION
Figure 2.2 F
V
for testing your electrical connections, you MUST shut down
IRST
ISION
's Windows® operating system before turning off the power. See "Make Connections to
" on page 15 for instructions on using F
V
LCD onto the enclosure's factory installed hinges (LCD hinges on
IRST
ISION
the left).
page 14.
page 16.
machined screws.
page 15.
F
V
™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07
IRST
ISION
Power Cable
from LCD
+24VDC/3A
Common GND
From Power Supply
V
Power Wiring Diagram
IRST
ISION
V
like a personal computer, and then
IRST
ISION
V
to Monitor Your Building" on
IRST
ISION
LCD Installation
J1
P1
Enclosure's
Control Board