Turn On Power To First Vision; 1: What Displays After The Initial Power Up Of F; Irst Vision Irst Vision; Windows Administrator Settings - Honeywell NOTIFIER ONYX FirstVision Installation And Operation Manual

Table of Contents

Advertisement

Turn on Power to F
V
IRST
ISION
3.3 Turn on Power to F
Turn-on the power supply connected to F
Instructions" on page 11 for installation information.
3.3.1 What Displays After the Initial Power Up of F
1.
Windows® XP Embedded will start and display.
2.
The software application "progress bar" will display and remain displayed until the loading of
the software application and its components are complete.
NOTE: Do NOT attempt to stop this loading.
3.
After the progress bar disappears; the software application will automatically start because a
shortcut to the application has been placed in the product's Startup folder.
NOTE: Do NOT remove this shortcut.
3.3.2 What You Should Know about F
Your LAN IP address (setup with Windows Internet Protocol (TCP/IP) Properties) has a default of:
192.168.0.4.
• If it is necessary to change the factory LAN IP address; refer to
Between Your LAN and F
The gateway that F
setting of 192.168.0.3.
• If it is necessary to change this factory setting; refer to
on page 23
• If it is necessary to change a gateway's IP address, refer to the gateway's respective
installation manual.
3.3.3 What You Should Know about F

Windows Administrator Settings

NOTE: Do NOT change the factory boot setup for F
administrator is automatically logged in at startup), or add any user accounts.
It is essential that the F
administrator account at startup, without asking for a password.

Screen Saver Settings

Monitor Power

A Monitor Power selection should NOT be changed from the factory default settings, which all are
set to Never (always on), because any setting will prevent the software application from starting
automatically after a power loss.
F
V
™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07
IRST
ISION
V
IRST
ISION
V
IRST
V
" on page 22
IRST
ISION
V
monitors (setup with Add Gateway Connection) has a factory
IRST
ISION
for information.
V
host computer remain configured to automatically log in the
IRST
ISION
Enabling F
V
IRST
ISION
. Refer to "F
V
ISION
IRST
ISION
IRST
V
IP Addresses
IRST
ISION
"Establish Communication
for information.
"Establish Gateway Communication"
V
Windows Settings
IRST
ISION
V
's host computer (that is,
IRST
ISION
to Monitor Your Building
Installation
V
ISION
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents