Commissioning
6.1
Measuring Gases
The shutoff fittings must be operated in the following order:
Initial position: all shutoff valves closed
1. Open shutoff valve (2B, Figure 24, p. 110).
2. Apply pressure corresponding to start of scale through the test connection of the
shutoff fitting (2) to the transmitter.
3. Check start of scale and correct if necessary.
4. Close shutoff valve.
5. Open shutoff valve (4) at the pressure tap.
6. Open shutoff valve (2A).
Transmitter above the pressure tap
(normal arrangement)
1
Transmitter
2
Shutoff fitting
A
Shutoff valve to process
B
Shutoff valve for test connection or bleed screw
3
Pressure line
4
Shutoff valve (optionally)
5
Shutoff valve (optionally)
7
Condensation vessel
8
Drain valve
Figure 24 Measuring gases