IAC INDUSTRIES Workmaster E Series Assembly Instructions Manual page 25

Table of Contents

Advertisement

Step 3:
Place the lower metal shelf between the pedestal leg assembly and the cabinet and rest one end on the
pedestal cross channel. Lower the opposite end of the lower metal shelf so that the slots at that end can be
aligned with the hardware installed in the cabinet footrest LMS bracket. Lift the lower metal shelf into place
and adjust the hardware into the slots and hand tighten so that the shelf will hang on the hardware. Adjust the
lower metal shelf forward or back to the desired location. Move the unistrut nuts in the pedestal cross channel
so that they line up with the slots in the lower metal shelf and attach it using the 1/4-20 x 1.00 hex head bolts
item D and the 1/4 flat washers item B. Tighten all hardware at this time.
Step 4
At this point the bench assembly is very heavy. Be sure that no assemblers are injured in the process of
turning the bench over onto its pedestal leg assemblies. Turn the bench over onto its pedestal leg assemblies
being very careful not to damage the worksurface by either drop it or by pulling on the pedestal legs too hard.
When the bench is turned over install the drawers into the cabinet and continue the assembly.
25

Advertisement

Table of Contents
loading

Related Products for IAC INDUSTRIES Workmaster E Series

Table of Contents