Electrical Safety-
This procedure establishes the minimum requirements for any electrical work that will be done on a
customer's site. You must comply with these requirements at all times. Failure to do so, may cause
death.
You WILL NOT work on any supply connections for power. A licensed electrician or customer
supplied electrician is required for any work conducted on electrical supplies.
You WILL NOT do any electrical work in the RAIN, and/or standing water.
You WILL NOT do any electrical work on live circuits. You must verify loss of power through
the use of a hand held Multi Meter, and or verified electrical tester before any work on existing
wiring or components is conducted.
You WILL use Lock Out/Tag Out procedures when working on electrical systems within the
CHC skid.
You WILL inspect your test equipment before use.
You WILL NOT use any test equipment with defective leads.
You WILL use safety glasses when troubleshooting electrical circuits.
Follow all safety guidelines as instructed to you during your electrical safety training.
If any problems are encountered you must notify EcoWater CHC management as well as the
customer.
27
Need help?
Do you have a question about the CHC Series and is the answer not in the manual?
Questions and answers