Self Commissioning - Delta Dual V4 Installation Instructions Manual

For ground water applications
Hide thumbs Also See for Dual V4:
Table of Contents

Advertisement

17.0

Self Commissioning

Name:
Property Address:
Property Contact:
Date complete:
Description of equipment (delete as appropriate): Delta Dual V4 / Delta Dual V6
Location of Chamber:
Pump 1 Serial Number:
Commissioning requirements
Chamber is clear of silt and debris.
Check activation of float switches by hand making sure they can operate without obstruction.
Cable joining kits (if fitted) to be moved away from pumps/floats and secured.
Turn gate valve anticlockwise to ensure it is fully open.
Electrically isolate pump set to standard height (duty pump), fill chamber with water and check pump
discharges in less than 40 seconds.
While standard height pump is isolated, fill chamber with water and check the high level alarm sounds
(alarm should operate between pump 1 and pump 2).
Electrically isolate pump set to high level (backup pump), fill chamber with water and check pump
discharges in less than 40 seconds.
Check pipework is connected correctly (look for leaks).
Check all cables are securely cable tied to manifold and clear of float switches.
Check each pump is wired to an individual 13A non-switched spur.
Check each spur is wired to an individual 16A RCBO (not RCD).
Label spurs using stickers provided.
Check power is on.
Check battery backup is switched on correctly if available (refer to manual).
Any additional comments: (further space overleaf)
Property Signature:
Print Name:
Date:
Please scan this commissioning form and email to service@ppsgroupuk.com
Inspectors Name:
Company Name & Address:
Company Contact:
Location of Alarm:
Pump 2 Serial Number:
Inspectors Signature:
Print Name:
Date:
Delta Dual V4/V6
Location of Electrics:
Complete